Navigate
About MOHA
Disaster Management Frameworks
Related Organisations
News
Events
Resources/ Articles
National Disaster Data
Hazard Maps
FAQs
National Platform
Photo Gallery
Suggestions
Contact Us
Home







Home > Related Organisations

Department of Water Induced Disaster Prevention (DWIDP)

Manpower and Physical Facilities

Manpower of the DWIDP

S.N. Description Department Division Sub-division Total
    Pool Regular      
1 Gazetted I (Tech.)   3 - - 3
2 Gazetted II (Tech.)   7 7 - 14
3 Gazetted III (Tech.) 2 19 22 5 48
4 Gazetted III   3 - - 3
5 Non-Gazetted I (Tech.) 8 15 44 10 77
6 Non-Gazetted I   6 14 - 20
7 Non-Gazetted II (Tech.)   - 2 - 2
8 Non-Gazetted II   2 7 10 19
9 Non-classified   5 30 10 45
  Total 10 60 126 35 231


Physical Facilities of the DWIDP

  1. Central office at Pulchowk
  2. Hydraulic Laboratory at Godawari
    • River simulation model facility
    • Debris flow simulation model facility
    • Landslide simulation model facility
    • Soil testing facility
    • Concrete testing facility
  3. Heavy equipment garage at Baneshwor
  4. Seven division offices and five sub-division offices.
  5. Gabion net weaving machines in Biratnagar, Parwanipur, Pokhara, Nepalgunj and Dhangadhi.



Read More on DWIDP:

Home  |  About Us  |  Contact Us  |  FAQs
Supported by UNDP Nepal  European Commission
If you have any questions / comments / suggestion about National Disaster Management:
Check our Frequently Asked Questions or send us your comments / suggestions.

Copyright © 2007-2009 – Ministry of Home Affairs – All Rights Reserved